The Project

EGGI Monitors Groundwater Quality Associated with the Blasting and Construction of the Largest Shopping Mall in New Hampshire to Protect Existing Public Drinking Water Supplies

On behalf of the Town of Merrimack and the Merrimack Village District (MVD), EGGI oversaw a groundwater quality protection program for one of the largest blasting projects in the State of New Hampshire. Construction of the Merrimack Premium Outlet Mall required the blasting of nearly 1 million cubic yards of rock, which is equivalent to the largest rock quarry activity in the State of New Hampshire. A significant portion of the blast zone was located within the Wellhead Protection Area (WHPA) for one of the highest-yielding public water supply wells operated by the Merrimack Village Water District. (This well yields 1.2 MGD.)  Protecting the quality and quantity of the groundwater resources produced from this well during blasting was imperative.

Status/Results:

As the Town’s consultant, EGGI ensured that the developer had prepared and followed a detailed blasting plan that was based on the best available science and leading industry practice. To monitor the effectiveness of the blasting plan, EGGI developed and oversaw the execution of a comprehensive groundwater and surface water monitoring program involving monthly groundwater sample collection from a network of onsite wells and surface water bodies. Sampling began prior to the start of blasting to establish baseline chemistry of the local aquifer, and continued on a monthly basis throughout the construction period.

Hundreds of water quality samples were collected at the project site. Although elevated nitrate levels associated with the blasting activities did occur at a select few sites, blasting activities could be properly managed such that the nitrate did not cause diminishment in groundwater quality at, or near, the MVD Production Well. EGGI continues to monitor water quality collected by the developer on a regular basis.

 

 

"

As the Town’s consultant, EGGI ensured that the developer had prepared and followed a detailed blasting plan that was based on the best available science and leading industry practice.

"
f7fad23084aeaea11cbde4d0a3bef479--130.jpg
dc962464a6df146afa155fb71c039b05--130.jpg
d207d0455b95672904cf3d7dc1142b6c--130.jpg
fa34e9f6f37a068d01658072277c3e48--130.jpg
a6b037b790251b76cca5a99607eb7341--130.jpg
cb82721020449355e74a7562cf83370c--130.jpg

P.O. Box 1578
56 Main Street
Meredith, NH 03253
T: (603) 279-4425
F: (603) 279-8717
eggi@eggi.com

“Data and research provide the underpinning for sound local water management decision-making that advances the well-being of the nation’s citizens, economy, and environment.”

- National Ground Water Association